1400 Long Beach
Construction has commenced on 1400 Long Beach, a new 5-level complex on Long Beach Blvd in the heart of the city.
Washington Villas
The KPRS Multifamily Group is constructing the Washington Villas in Long Beach for Habitat for Humanity of Greater Los Angeles.
New Housing Breaks Ground at 1400 Long Beach Blvd
The KPRS team recently gathered with Meta Housing, The City of Long Beach, and The Foundation for Affordable Housing to commemorate the launch of construction at 1400 Long Beach Blvd in Long Beach, CA.
Two KPRS Projects Win Top Recognition with LA Business Journal
Our project teams were thrilled to be named the Gold winners at the Los Angeles Business Journal’s Commercial Real Estate Awards ceremony.
A Closer Look: ConXtech at The Depot
What was formerly known as the dairy truck servicing depot for Unified Grocers has now been reimagined as The Depot—a new ground-up three-story creative office fittingly named with a nod to its former life.
Construction Safety Week: “Value Every Voice”
Before a project even begins to take shape, our commitment to safety is a top priority at KPRS. As an integral part of our culture, we are pleased to share the voices of our team members, their safety best practices and successful outcomes on a variety of project challenges.
C3
The C3 office building constructed in Culver City, CA redefines the office environment for creative professionals in the Los Angeles market.
Construction Safety Week: Q&A with the KPRS Safety Team
As part of the industry's nationwide recognition of Construction Safety Week, we took some time to talk more specifically on the role of the KPRS Safety Team, and what it means for the overall culture of safety for the entire organization.
Claremont McKenna College - Robert Day Sciences Center
Construction is underway on the Robert Day Sciences Center at Claremont McKenna College in Claremont, CA. The notable, iconic structure is an integral part of future CMC campus expansion efforts.
KPRS Participates in NAIOP Legislative Affairs in Sacramento
The purpose of the trip was to meet with assemblymembers, senators and other political professionals to bring attention to three bills in particular: AB 2904, AB 2433, and SB 1103.
Work
The concept of going to work today has a much different meaning than even a decade ago.
Improve
There is something striking about entering a refreshed and redefined space, one that is built according to the purpose it serves.
Rocket Lab Clean Room
The KPRS Tenant Improvement group has constructed multiple phases as part of the Rocket Lab headquarters expansion, including the new Photon Lab Clean Room.
Aegis Living San Rafael
KPRS is currently constructing the new Aegis Living San Rafael senior community in San Rafael, CA.
Great Park Neighborhoods Solis Park
The new Great Park Neighborhoods Solis Park was completed within the Irvine development. The park offers surrounding residents a unique pool and cave grotto experience along with high-end gathering spaces.
Anderson Towers - Avenue of the Stars
The campus at 1800 and 1900 Avenue of the Stars is undergoing an extensive exterior reposition to better reflect the quality of the property while efficiently accommodating tenants and visitors on the site.
Storied Structures: 3 Considerations for Reposition and Adaptive Reuse Projects
As older offices phase out and warehouse structures become vacated, giving these buildings new life and purpose has shifted not only how they are labeled but the approach to how they are constructed.
Alcon Innovation Center
The Alcon Innovation Center is a specialized training lab located at Alcon’s research and development campus in Lake Forest, CA.
Realtor.com
The KPRS Tenant Improvement team constructed one of Realtor.com's newest corporate office locations in Westlake Village.
12118 Bloomfield Ave
Currently underway in Santa Fe Springs, the KPRS Industrial Group is constructing the 104,870 sf tilt-up building at 12118 Bloomfield Avenue.
KPRS Promotion and Hiring Announcement
As KPRS continues to grow and expand our teams, we are pleased to add three very qualified individuals to our executive leadership group.
Reyes Coca-Cola Bottling
The new Reyes Coca-Cola Bottling West Coast headquarters offices in Irvine were designed and constructed to reflect both the rich history and progress of the company and its range of services.
Aston at Gateway
Located on a 2-acre site in the vibrant community of El Monte, the Aston at Gateway apartments offer upscale amenities and flexible floorplans for residents in the heart of Los Angeles.
Nuevo Distribution Center
The KPRS Industrial Group is constructing the Nuevo Distribution Center in Riverside County, CA. The new facility will provide 200,000 square feet of logistics support to a future commerce tenant.
Yamaha Corporation of America Headquarters
The KPRS team is performing a significant renovation and multi-phased expansion of the Yamaha Corporation of America headquarters campus in Buena Park.
Joel H. Stensby
President, Co-Founder
Live
Where you live is not just an apartment, it’s a home. And it’s not just a hotel visit; it’s a savored experience.
Clearwater Sonoma Hills
The Clearwater at Sonoma Hills is an Assisted Living and Memory Care home for seniors.
The Depot
The Depot is a new three-story creative office, constructed in the historic Jefferson Park neighborhood in Los Angeles.
Silva
KPRS is currently constructing Silva, a new ground-up residential development located in the heart of Los Angeles.
Deliver
In tilt-up construction, the details are important—not only in how the slab is poured, but how relationships are built with city, county, and public agencies. We don’t just arrive to the site as the builder; we walk through every element, ensuring the project is successfully executed from start to finish.
Agua Mansa Commerce Park
Located in the distribution hub of Riverside County, KPRS constructed the Agua Mansa Commerce Park in partnership with CT Realty and RGA.
Play
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
On Site: Women Who Build
March is Women’s History Month and in recognition of Women in Construction Week, we thought it appropriate to acknowledge both these nationwide celebrations and distinguish the larger role of women’s contributions in the construction industry.
AMLI Aero
The KPRS Multifamily team is currently constructing AMLI Aero – a 434-unit apartment community centrally located in San Diego, CA.
KPRS Opens Culver City Office
We are pleased to announce the opening of our newest office location.
Entrada
KPRS constructed Entrada, a 300,000 sf creative and mixed-use office in Culver City.
I-10 Logistics Center
Located in Cherry Valley, at the foothills of San Gorgonio, the I-10 Logistics Center features two warehouse buildings constructed for large-scale commerce tenants.
Vice President of Construction, Multifamily
Nolan Yasuhara
Managing Director
Corey Evans
Corey’s leadership in innovative office construction has contributed to the growth and presence of KPRS in the Los Angeles market.
Celebrating Women in Construction Week
While the vocations of women in construction continue to expand industry-wide, KPRS is proactive in creating opportunities for women to lead. This year we are proud to share the stories and varying roles that contribute to and ensure the successful growth of KPRS.
KPRS President Joel Stensby Named to OC 500 List
Published by the Orange County Business Journal, the list is a compilation of the top 500 influential leaders throughout the region.
Market Update: Q2 2022
This quarter we focus on the multifamily market at KPRS. Roughly a quarter of the work estimated comes from our multifamily group and encompasses market-rate, affordable, senior living, assisted living and hospitality assets.
The Bluffs at Playa Vista
Located on the thriving Westside, the KPRS TI group created centralized common areas for The Bluffs at Playa Vista, transforming the site into a connected campus environment.
Kip Kamoto
VP, Managing Director
888 Douglas
Constructed for Hackman Capital Partners and in partnership with Gensler, the transformation of the 888 Douglas creative campus contributes to the flourishing commercial growth taking place in El Segundo.
Aliso Ridge Behavioral Health
The KPRS Heal Group constructed the new Aliso Ridge Behavioral Hospital, a temporary care facility for psychiatric services, in Aliso Viejo, CA.
The Fitz on Fairfax
Located in the Fairfax district of West Hollywood, The Fitz on Fairfax luxury apartments offer well-appointed features and modern design.
iRhythm Technologies
The new offices constructed for iRhythm in Cypress, CA feature high-end interiors with a dedicated production facility for the medical manufacturer.
Market Update: Q1 2022
At KPRS, we value providing real-time data on the construction industry as a resource to our clients. Here we provide a Quarterly Market Update outlining some of the key items we are paying attention to on a daily basis.
Tech Spotlight: Building with Site Scan
What began as an innovative method for capturing aerial progress of projects by drone has evolved at KPRS into a full VDC program—complete with the use of Site Scan for ArcGIS analytics platform, a fleet of drones and a team of licensed pilots.
5788 W. Adams
KPRS partnered with Redcar Properties and RAC Design Build on the new creative, mixed-use office at 5788 W. Adams in Los Angeles.
Industrial on The Rise: Q+A with Founding Partner Paul Kristedja
Since the coronavirus pandemic took hold two years ago, the increased need for logistics and warehouse space quickly escalated and fast-tracked the industry to what seems an unstoppable trajectory of growth.
Silva Crossing
Located in the Sylmar neighborhood in the San Fernando Valley, Silva Crossing offers increased housing opportunities in the Los Angeles region.
Westminster Crossing
Located in North Orange County, Westminster Crossing is a multifamily housing complex featuring 65 units.
Oasis Senior Center
Recipient of the Award of Excellence by the California Park & Recreation Society, the Oasis Senior Center project involved the demolition and ground up construction of a 36,600 sf facility.
Long Beach & 21st Apartments
The Long Beach & 21st Apartments for seniors is a 41-unit residential complex constructed to accommodate a high density of residents.
The Exchange at Gateway
The Exchange at Gateway is transit oriented housing development adjacent to the new El Monte Station.
First Nandina II Logistics Center
The First Nandina and First Nandina II Logistics Center are constructed for First Industrial in the distribution hub of Moreno Valley, CA.
Hoag Health Center
The Hoag Health Center in Tustin is part of the Village at Tustin Legacy shopping center, which was also constructed by KPRS.
Orange County Great Park
The Orange County Great Park, owned by the City of Irvine, spans approximately 1,300 acres, and has quickly become a central point of recreation for Orange County residents.
Industrial Safety Innovations
As the volume of industrial projects continue to increase at KPRS, we’ve enacted several additional priorities as part of our industrial safety protocols.
Cambria Hotel Calabasas
The Cambria Hotel Calabasas is a luxury hotel located in the hills of Calabasas, within a short distance to iconic Malibu beaches.
The Crossroads at Washington
The Crossroads at Washington is a new multifamily community offering 86 residential units mixed with ground-floor commercial space.
Building Y Creative Office
Constructed on a historic studio lot, Building Y offers both a creative office and soundstage support space for the media tenant now occupying the campus.
Wild Rivers
Wild Rivers has officially returned to Irvine, constructed by the KPRS team within the OC Great Park development.
Culver City: Q+A with Division Manager, Corey Evans
Here we get Corey's unique perspective and outlook on what’s to come for Culver City.
Inari Medical
Inari develops medical devices to help treat venous diseases. The new 120,000 sf headquarters location provides expanded space for offices, labs, production and research.
Beckman Coulter Headquarters
The Beckman Coulter headquarters campus renovation was highly rewarded for its design, earning both LEED Gold status and the McGraw Hill Best of Award for Interiors.
El Monte Busway and Transit Center
KPRS constructed the new El Monte Busway and Transit Center for the Los Angeles Metro Transit Authority.
555 Aviation
The 555 Aviation repositioning project transformed the existing office park into a creative campus.
Marina Park
Marina Park was constructed on a 10.5-acre site, and was designed to meet LEED Silver rating requirements.
Burbank Water and Power
The Burbank Water and Power project includes a 34,045 square foot service center warehouse and the remodel of the building’s administration lobby.
The Culver Steps
The Culver Steps mixed-use development brings a point of connection as the area grows to accommodate creative, tech and media markets.